![]() The Eastern Corridor Stage One project is under construction on State Highway 30/Te Ngae Road between Sala Street and Iles Road. Vertical clearance is critical, and for longer underpasses lighting may be needed. Installing a new lighting supply to the underpass. will pass beneath vehicular bridges to create a grade separated path.Constructing a new handrail on the northern side of the underpass Twenty eight of the examined underpasses (23 box sections and 5 frames) belong to the Egnatia Motorway, which is part of the Trans-European Network for Transport and one of the most significant.Widening and levelling the existing pathway under the bridge.Constructing a widened path and new balustrade on the edge of the bridge on both sides. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |